Watch it review one submittal.
Submittal 26 24 16-02 against section 26 24 16. A prepared example, so you can check its work before giving it yours.
What the section actually requires.
One section of Division 26, exactly as the design team issued it. SmartBldr did not write this and does not change it.
- 2.1.A
- Manufacturers: Subject to compliance with requirements, provide products by one of the following: Eaton Corporation; Schneider Electric; Siemens Industry, Inc.
- 2.1.B
- Enclosures: Flush and surface-mounted cabinets, NEMA 250 Type 1, finished in manufacturer's standard gray.
- 2.1.C
- Submit shop drawings showing panelboard layout, nameplate schedule and circuit directory. Submit product data for each type of panelboard, overcurrent protective device and accessory.
- 2.1.D
- Delivery lead time shall not exceed 14 weeks from release for construction.